Klark Teknik DN540 User Manual Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 54
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
DN540
Operator Manual 9
Chapter 3: Getting Started
Observing the IMPORTANT SAFETY INSTRUCTIONS at the front of the manual and the
guidelines in "Precautions" on page vii, carry out the following to get your DN540 unit
fully operational.
Unpacking
Carefully unpack your DN540 equipment package.
Then, inspect the DN540 unit carefully for any signs of damage that may have occurred
during transit and notify the courier immediately if you discover any.
Check the contents of your DN540 equipment package. If there are any parts missing,
incorrect or faulty, please contact your local distributor or Klark Teknik at the address at
the front of this manual. The following is a list of the main items contained in the
DN540 package.
Please retain the original packing in case you should need to return the equipment to
the manufacturer or supplier, or transport or ship the unit later.
Checking the mains fuse
Before installing the equipment you need to make sure that the mains fuse fitted is of
the correct type and rating for your unit. To do this refer to “Replacing the mains fuse”
on page 39.
Installation
This unit is designed for mounting in any 19” EIA standard rack. Four rack-mount holes
in the front panel are provided for rack mounting and are designed to fully support the
weight of the unit in the rack.
Note: Avoid over-tightening the rack-mount screws, as this could damage the front
panel.
The position of the unit will depend upon how it is to be used. However, when
positioning the unit, avoid placing it where the control knobs may be damaged by being
accidentally knocked or snapped off. Also, try to avoid placing the unit directly near or
on any power distribution units or power amplifiers.
Quantity Description Part number
1 DN540 unit Not applicable
1 DN540 Operator Manual (this document) DOC02-DN540
1Warranty card DOC04-WARRANTY
1Mains lead PWR21-MAINSLEAD
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 53 54

Comments to this Manuals

No comments